Tuesday, March 22, 2011
Reverb structures details and materials specifications
Details presented by structures team on Tuesday, March 22, 2011
1. How does sintra panel attach to aluminum panel
2. Foot of panels. How does sintra panel sit on the ground. Consider need for gaps to route electrical wires if needed.
3. Shelf. How does bracket for shelf attach to sintra panel or to aluminum channel.
4.How does shelf attach to bracket. Determine depth of shelf based on available raw material (8'X4' sintra or ply).
5-6. How does lighting (which type) attach to upper shelf. Determine upper shelf which also functions as stiffener for structure.
7. How does aluminum cross brace attach to upper shelf or aluminum channels.
8. Islands with shelves. Design matches larger wall except less vertical material (none?) Consider using 1"x1" channel of which we already have some. Must display 3D products, hold DVD players and various projectors. Must route electrical and AV wiring.
9. Projection screens. Approx. 48"x36". Determine frame material for stretching fabric with thread. How do frames attach to uprights. Determine number of screens. Ideally 24 screens but getting 24 LCD projectors is a challenge. Slide projectors only show static images, not very appealing.
10. Artwork hanging system. Determine method for hanging artwork.
Attached are also the dimensions of the materials currently being considered. If we need to double up on the sintra that's OK. A quick calculation of 48 panels x $40 is still less than $2000. the shelves could be wood. I did a rough quick calculation: sintra: $2000; channel: $2000; 1/2" plywood: 1000. The plywood includes shelves for the main structures (12x48 each) and shelves for the islands (24x48 each), 6 for each island, stacked 3 times, one for products and 2 for equipment. Lighting is still out of the picture and it needs to be addressed.
Tuesday, March 16, 2010
structures idea
Friday, March 12, 2010
structures idea
Wednesday, April 15, 2009
Wednesday, March 25, 2009
Stream wall prototype and floor model 3-25-2009
Hi all,
Seth, Paul, Simon, Leo, Jim Tay and others have been busy in the shop this week. Two prototypes were built as of today. Plywood will be delivered tomorrow for the entire production. Seth also used the laser printer to cut the parts for the 40 scale pieces that you see in the pics. With the help of others from the class, we plan to make a beautiful model that can be exhibited at the show (the exhibit of the exhibit). If you are resting for the spring break, be prepared for a huge push when you come back. We have a lot to do but it's shaping to be a fabulous show.



Seth, Paul, Simon, Leo, Jim Tay and others have been busy in the shop this week. Two prototypes were built as of today. Plywood will be delivered tomorrow for the entire production. Seth also used the laser printer to cut the parts for the 40 scale pieces that you see in the pics. With the help of others from the class, we plan to make a beautiful model that can be exhibited at the show (the exhibit of the exhibit). If you are resting for the spring break, be prepared for a huge push when you come back. We have a lot to do but it's shaping to be a fabulous show.